« Master Bath Starts This Weekend | Main | We've Moved (Our Site) »

Six Weeks, and Counting


mbrcollage.jpg

It's been a few weeks since we started the master bathroom renovation. As you can see from the pictures, it's been quite a job ... a total re-do from the floors to the ceiling.


Since our last post, we've:



  • completed the floor system, including floor joists and subfloor;

  • roughed in the plumbing;

  • reworked the electrical;

  • built a couple of small walls and installed the shower pan;

  • added rock board around the lower half of the room;

  • repaired , replaced and refinished the plaster;

  • painted the trim and upper half of the walls, and

  • started putting up the tin ceiling.


You can see more pictures on our Picasa site. With any luck, we'll finish the ceiling this weekend, and Andi will start stenciling the paint job next week. After that, tile the shower, tile the floor, tile the lower half of the walls, install the fixtures ... and ... take a vacation.


Stay tuned.


Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)